如何加强工程造价管理问题综述

【摘 要】如何效控制工程造价,需要对工程项目实行全过程和全方位的工程造价管理,抓好设计阶段工程造价管理、工程材料价格的确定等工作,同时要加大工程招投标的力度,加强工程造价领域计算机的应用,提高预算人员的综合素质等。本文提出了一下个人见解,以供同行参考。

【关键词】工程;造价;管理

Overview of how to strengthen the management of project cost

Ye Jin-lian

(Well-being of Yu Feng Construction & Engineering Limited Ankang Shaanxi 725700)

【Abstract】Effective control project cost, the need for the project of the whole process and comprehensive project cost management, grasp the design phase of project cost management, engineering materials prices to determine, at the same time to increase the intensity of the project bidding to strengthen the project costthe field of computer applications to improve the quality of budget staff. In this paper, my personal opinion, for the peer reference.

【Key words】Engineering;Cost;Management

工程造价管理是建设工程管理的重要环节,此项工作的好坏体现出工程技术与经济管理者的水平,对投资方而言,又决定着一个项目要达到预期投资目标的成败关键。因此怎样合理控制工程造价,最大限度地把握造价是一名建设管理者必不可少的素质。降低建设工程成本,节约建设资金,以最小的投入,创造最佳的效益,这是建筑经济工作所追求的目标。但长期以来,我国基建工作普遍存在着严重的“三超”现象,投资效益不高,因此,工程造价管理工作日益引起人们的重视。工程造价管理就是合理地确定和有效地控制工程造价。

1. 综合管理

建设工程分为投资决策阶段、设计阶段、建设项目发包阶段、建设实施阶段。建设工程造价分阶段分别计算、分别编制投资估算、设计概算、施工图预算和竣工结算,改革造价管理体制,理顺各方关系势在必行,建立相关部门必要、定期的相互协调联系制度,以确保标准和指标相互衔接、配套。建设单位、设计单位、施工单位缺乏沟通与协作,也将直接导致建筑工程“三超”现象普遍存在。建设单位往往从主观愿望出发,对工程立项缺乏科学谁估算不足,造成缺口。设计单位在设计阶段虽作了工程概算,甚至细化预算,但由于缺少对设计方案造价指标的控制约束,导致设计保守、投资偏离。监理单位受项目业主的委托对项目实施监督与管理,往往只局限于施工阶段的质量与进度管理,很少介入投资决策分析,监理人员只是偏重于对施工过程质量、进度负责,对造价方面考虑得很少,尤其是涉及到项目变更,现场签证,不能将质量、进度、经济三方面有效统筹起来考虑。因此,作为建设方应主动协调、沟通各方关系,建立统一的造价管理目标,并建立起行之有效的造价监督机构,对建设、勘察、设计、监理、施工单位进行定期监督检查,对造价投资失控找出原因,对无理由的失控提出一定经济处罚建议,同时还应采用即时补救措施。